Prices for connection

Prices for connection of project sites of customers to the electricity transmission and distribution grid
Consumer group Connected capacity (kWh) Price

For power supply line length up to

25 (BGN)
For every other additional meter length of power supply line over 25 (BGN./)
1 up to 6 444 26
2 from 7 t 15 696 26
3 from 16 t 50 2 316 26
4 from 51 t 100 5 880 40
5 from 101 t 200 9 600 40
6 from 201 t 500 21 360 59
7 from 501 t 1000 42 270 59
8 over 1000 Individual design

Information regarding the process of connection to the electricity distribution grid of E.ON Bulgaria Grid AD (new name ENERGO-PRO Grid AD) and the required forms can be found in section Connection and Buy back.