Connecting generators

Connection of electric power plant from renewable sources (in Bulgarian, 25 KB, pdf)

Request for preliminary research for connecting a generator (in Bulgarian,124 KB, pdf)

Request for research of the conditions for connecting electric power plant (in Bulgarian, 214 KB, pdf)

Request for research of the conditions for connecting photovoltaic power plant (in Bulgarian, 235 KB, pdf)

Request for research of the conditions for connecting wind power plant (in Bulgarian, 214 KB, pdf)

Information as of Art. 23 (7) of the Law on Renewable Energy (LRE)

1. Approved capacities by regions of connection


Projected electric power capacities that can be provided for connection to the transmission and distribution grids of sites for the generation of electricity from renewable sources by regions of connection and voltage levels from 07/01/2012 until 07/01/2013, pursuant to decision № EM-01 of 29.06.2012 of the STATE ENERGY AND WATER REGULATORY COMMISSION.

 

Total admissible new installed capacity, MW, including by grid energy regions (GER):
Voltage level High and middle
GER Sofia city 0 MW
GER Sofia region 0 MW
GER Blagoevgrad 0 MW
GER Montana 0 MW
GER Pleven 0 MW
GER Gorna Oryahovitsa 0 MW
GER Ruse 0 MW
GER Shumen 0 MW
GER Varna 0 MW
GER Burgas 0 MW
GER Stara Zagora 0 MW
GER Haskovo 0 MW
GER Plovdiv 0 MW

 

2. Statements of opinion for access

3. Statements of opinion on the conditions and ways of connection

4. Information on the returned applications/requests as of the sequence of Art. 23 (6) of LRE